8 noiembrie, 2023
First lot of pipes from the Tuzla – Podisor gas pipeline has been discharged in the SCS terminal.
This project, with a total length of 308 kilometres, will ensure the transport of gas resources from the Black Sea, starting with 2027.
Stiri asemanatoare
LATEST PURCHASES
The two N.C.Nielsen NCN85 reach stackers have finally arrived.
Sea Container Services has become the majority shareholder at Santierul Naval Orsova (Orsova Shipyard)
through the recent acquisition in the Bucharest Stock Exchange system of the majority stake.
A new acquisition
The fourth Sennebogen material handler was recently added to our line-up of machinery.